  We have proudly provided Height Safety Audit,Training and Equipment supply services to the Walt Disney Company on the Lion King production here in the UK.

Mowlem PLC contracted our services for the appraisal of Height Safety practices on the Portsmouth Spinnaker Tower project. This contract was then extended to include numerous aspects of the works required for completion including the installation of the exterior feature lighting, glazing repairs, the external lift and the painting of the structure itself. Our involvement continues in a close working relationship with both the towers owners and the operators to this day.

   The Continuum Group operate a number of attractions around the UK, including Spinnaker Tower and Oxford Castle. Working with Continuum as its Specialist Access contractor has allowed the group to continue in its management role without the time consuming delays that can come about with Working at Height

Haymills are an independent construction company with a reputation for specialist high quality projects. The bespoke Height Safety System designed on their behalf at Pallant House Gallery, Chichester reflects this reputation. Carefully designed to provide minimal visual impact, whilst providing maximum user safety

The construction of a high profile developement Rope Quays alongside Frater Lake, Gosport required unique access solutions. Both safe working practice procedures and supplier suitability were provided on this project with a satisfactory completion.

Carrilion PLC have continually used our Consultancy, Roped Access and Training services on various projects over the last 7 years. From basic Working at Height procedures, Roped Access personnel to Safety System Installations and Height Safety Audits, our experience has allowed Carrilion to manage Height Safety with the minimum of complications.

  Asda are not just your local supermarket. Their distribution wharehouses are some of the largest in the UK. Computerised loading systems work alongside personnel 24hrs a day. The requirement to access the upper reaches of these systems when a fault arises instigated a lengthy appraisal of working practices. The implimentation of specialist training for these personnel along with suitable equipment and procedures continues to this day ensuring that safety is maintained to the highest standard.

The welfare of BT's staff at its headquarters in Crawley required a rather unusual approach. Its spacious offices are air conditioned to ensure their comfort - however the equipments maintenance was of major concern. Located above a 3 storey lobby, the units position required the design and manufacture of a rather unusual solution. Its successful implementation has allowed the servicing to be undertaken in complete safety for the operatives concerned.

  